Laserfiche WebLink
I <br /> Condensate Knockout <br /> Contractor to procure and install the condensate knockout and drum specified in Sheet <br /> M-1. Please provide appropriate -anistrut support to the condensate knockout. <br /> Burgess Manning--(716) 662 6540. <br /> Chain link Fence <br /> Contractor to install an 8-feet high chain link fence and with beige colored slats. Fence, <br /> gate and span post to be constructed based on specification on Sheet C-1. Also see Sheet <br /> C-2 <br /> I As halt Surface <br /> Contractor to provide 2-inch thick asphalt top, inside the system enclosure (area <br /> 300 ft), The asphalt is to be underlain by a minimum of 4-inches of Class li aggregate <br /> base. <br /> 4.0 Electrical <br /> See Sheet C-1 and City of Lodi Specifications. <br /> All work to be completed by a certified electrician. Contractor to verify all wire sizes <br /> before installation. <br /> Contractor to provide 230 volt, single phase, 60 hertz, 200 amp, power to the mail power <br /> panel of the catalytic oxidizer. <br /> Contractor to procure and install 30-high power pole with guy wires and tie downs. <br /> Obtain electrical permit and pass,inspection. <br /> Provide and install City of Lodi approved Service Pole and service entrance conductors <br />` with conduit and rain cap. Include guy wire supports and grounding electrodes. <br /> Provide and install one 200-amp single-phase meter main combination load center with <br /> local utility company approved test/bypass facility. <br /> The temporary service shall be complete and fully fumetional to meet all local utility <br /> s <br /> company, NEC and local building department requirements. <br /> I <br /> r <br /> I CA1My DocnmentslUSA1651Construc#io specs.doc ,Stratus <br />