Laserfiche WebLink
Figg 5 <br /> ary I February March Apri <br /> ID Task Name Duration Start Finish 1117 1 1124 1/31 2/7 2114 1 2/21 2128 3/7 3114 3/21 3/28 4/4 4111 <br /> 1 SVETS Implementation 154d Wed 1120199 Mon 8123199 <br /> 2 Submittal of RAP 1d Wed 1/20/99 Wed 1120199 1120 <br /> 3 SJPHD Acceptance of Proposed System* id Mon 2122199 Mon 2122/99 22 <br /> 4 Installation of air sparge wells 5d Mon 3/22/99 Fri 3/26/99 <br /> 5 Pilot Test 5d Mon 3/29199 Fri 412/99 <br /> 6 Finalize Design 5d Mon 5117/99 Fri 5/21/99 <br /> 7 Planning Department Review 7d on 5/24199 Tue 6/1/99 <br /> 8 Permitting* 11d Wed 6/2199 Wed 6116199 <br /> I <br /> 9 Building Approval 6d Wed 612/99 Wed 6/9/99 <br /> 10 Electrical Approval 5d Thu 6110/99 Wed 6/16/99 <br /> i1 8 VAPCD ATC/PTO* 90d Tue 2123/99 Mon 6/28/99 <br /> 12 Retain Contractor 10d Fri 5/21199 Thu 613/99 <br /> 13 Equipment Lead Time* 30d Thu 6/3/99 Wed 7114/99 <br /> 14 Catalytic oxidizer 30d Thu 6/3/99 Wed 7114199 <br /> 75 Air sparge blower Sod Thu 6/3/99 Wed 7114/99 <br /> 16 Piping 1d Thu 6/3/99 Thu 613199 <br /> 17 Construction 15d Thu 7115/99 Wed 814/99 <br /> 16 Construction Inspections 13d Wed 814/99 Fri 8120/99 <br /> 26 Start up&Troubleshooting 1d Mon 8123199 Mon 8123199 <br /> it <br /> i <br /> I� <br /> Task Rolled Up Task <br /> Project: USA Petroleum Corporation Station No.65Progress Rolled Up Milestone O <br /> 2500 West Lodi Avenue <br /> Lodi, California Milestone Rolled Up Progress <br /> Summary 1Wi <br /> Denotes Critical Path Item 1 <br />