Laserfiche WebLink
Fig 5 <br /> May June July August <br /> ID Task Name 4118 4125 5/2 5/9 5/16 5/23 5/30 616 8/13 fi/20 6/27 7/4 7/t i 7/18 7/25 811 818 8/15 8/22 <br /> 1 SVETS Implementation <br /> 2 Submittal of RAP <br /> 3 SJPHD Acceptance of Proposed System <br /> 4 Installation of air sparge wells <br /> 5 Pilot Test <br /> 6 Finalize Design <br /> 7 Planning Department Review <br /> a Permitting <br /> S Building Approval <br /> ME <br /> 10 Electrical Approval <br />` 11 SCVAPCD ATC/PTO <br /> 12 Retain Contractor <br /> 13 Equipment Lead Time <br /> 14 Catalytic oxidizer <br /> 15 Air sparge blower <br /> 16 Piping <br /> 17 Construction <br /> 18 Construction Inspections <br /> 26 Start-up&Troubleshooting <br /> go oil <br /> ` 8/2 <br /> I <br /> Task � Rolled Up Task <br /> Project: USA Petroleum Corporation Station No.65 <br /> 2500 West Lodi Avenue Progress <br /> Rolled Up Milestone O <br /> Lodi,Catifomia Milestone Rolled Up Progress <br /> Summary <br /> *Denotes Critical Path Item 2 <br />