Laserfiche WebLink
,xrrix�i4r 5j `i ulu 649 5010 STATE FARM SOSAC 1?1005/007 <br /> O <br /> rii <br /> EFMFONMENSliLTEIINp�p[.f�S COPPOf�tTION <br /> October 6, 1997 <br /> P90927 <br /> Mr. Vince Sand <br /> Rossetti's Market <br /> 25411 East Lone Tree Road. <br /> Escalon, California 95320 <br /> Subject. Proposal and Cost Estimate for Site Investigation at Rossetti's Market, <br /> 25411 East Lone Tree Road,Escalon,California <br /> Dear Mr. Sand_ <br /> Smith Technology Corporation (ATC Associates) is pleased to submit this proposal and cost <br /> estimate for performing site investigation activities at the above referenced site. The purpose of <br /> the site investigation is to determine the vertical and horizontal extent of petroleum hydrocarbon <br /> contamination. This work is being done at the request of San Joaquin County Environmental <br /> Health Division (PHS/EHD). The scope of work will include preparing a workplan, obtaining <br /> permits, drilling three soil borings, soil and groundwater sampling and analysis, and preparing a <br /> summary report. The scope of work is described in detail in the following paragraphs. <br /> PROPOSED SCOPE OF WORK <br /> Task 1: Workplan Preparation and Permits <br /> Under this task, Smith Technology will prepare a workplan and a health and safety plan, including <br /> necessary drilling permit applications and fees for the subsurface investigation. Both plans will <br /> conform to the UST Corrective Action Site Safety Guidelines set forth by the PHS/EHD. The <br /> workplan: health and safety plan, and a tentative work schedule will be sent to the client in draft <br /> form. Any comments will be incorporated into the workplan and then submitted to PHS/EHD for <br /> review. Smith Technology personnel will conduct a site walk and mark the surface of the site for <br /> Underground Services Alert (USA). USA will be contacted at least 48 hours prior to any field <br /> work to allow time for utility companies to identify any underground lines, pipes, or cables that <br /> may be affected by subsurface investigation activities. <br /> Task 2: Soil Baring Installation <br /> This task includes mobilization to the site, advancing three soil borings, and collecting up to two <br /> soil samples and one grab groundwater sample from each boring. This scope of work was <br /> w4ropoW%v9M7.doa 1 <br /> 1260Oraghics Drive • Modeno.CA 93351-1542 • (209)579-2221 • pa:(ZOg1379-2725 <br /> FAtineerint - Coandfinr • Remediation • Conirrvdt n <br />