Laserfiche WebLink
fr Mr. Ron Rowe CAMBRIA <br /> October 15, 1997 <br /> i; <br /> i <br /> • Soil and water disposal methods, <br /> • A discussion of the hydrocarbon distribution, and <br /> • if more than one well is installed,two cross-sections will be included, one perpendicular to ground <br /> water flow, and one along the ground water flow direction. <br /> SCHEDULE <br /> Upon receiving written work plan approval from the SJCPHS, Cambria will schedule the field work.. <br /> Cambria will submit an investigation report approximately six weeks after completing the field work.We <br /> appreciate-the opportunity to work'with you.on this project. Please call if you have any questions or <br /> comments. <br /> Sincerely, <br /> Cambria:Environmental Technology, Inc. <br /> w� Ia#ALEO�RM�AAN w`� <br /> Owen C.Ratchye,P. . . No,0281- <br /> Project Engineer IRTI <br /> Mr am <br /> Exp: <br /> At 1Q,- <br /> •4pF�'Ch►11F��� <br /> Khaled B. Rahman,R.G.,C.H.G. <br /> Senior.Geologist <br /> \\Sarver\f_drive\PROJECIISHELL\It1P341\Correspondence\Wkpin_Add_2.wpd <br /> cc:.-Mr.A.E.-(Alex)Perez,Shell Oil Products Company,P.O.Box 8080,Martinez,CA 94553 <br /> I <br /> 4 <br /> L � <br />