Laserfiche WebLink
'• JUN-29-1998 17:28 CAMBR I A 510 420 9170 P.04/08 <br /> Mr. Ron Rowe � CAMBRIA <br /> June 29, 1998 <br /> ( � • Analytic reports and chain-of-custody forms, <br /> V <br /> • Soil and water disposal methods,. <br /> • A discussion of the hydrocarbon distribution, <br /> • Two cross-sections,one perpendicular to and one parallel to the assumed ground water flow direction, <br /> • Proposed additional ground water monitoring well location and design,and <br /> • Proposed periodic ground water extraction program. <br /> SCHEDULE <br /> Upon receiving written work plan approval morn the SJCPHS,Cambria will schedule the field work. Cambria <br /> will submit an investigation report approximately 4.5 days after completing the field work. We appreciate the <br /> opportunity to work with you on this project. ?lease call if you have any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology,Inc. <br /> Owen C. Ratchye, _ 4�pFESS <br /> Project Engineer 4&; <br /> Q N T <br /> {r NO. C46725Diane 1 <br /> Principal EnguneeP.B. �jalE�CtC�1F�F�\� <br /> Attachment A:CPT Field Protocol <br /> cc: Mr.A.E. (Alex)Perez,Shell Oil Products Company,P.O.Box 8080,Martinez,CA 94553 <br /> G:1RiP3411Cammspundcncelwkpin_Add_3.wpd <br /> 4 <br />