My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 1:48:30 PM
Creation date
3/6/2020 1:34:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'• JUN-29-1998 17:28 CAMBR I A 510 420 9170 P.04/08 <br /> Mr. Ron Rowe � CAMBRIA <br /> June 29, 1998 <br /> ( � • Analytic reports and chain-of-custody forms, <br /> V <br /> • Soil and water disposal methods,. <br /> • A discussion of the hydrocarbon distribution, <br /> • Two cross-sections,one perpendicular to and one parallel to the assumed ground water flow direction, <br /> • Proposed additional ground water monitoring well location and design,and <br /> • Proposed periodic ground water extraction program. <br /> SCHEDULE <br /> Upon receiving written work plan approval morn the SJCPHS,Cambria will schedule the field work. Cambria <br /> will submit an investigation report approximately 4.5 days after completing the field work. We appreciate the <br /> opportunity to work with you on this project. ?lease call if you have any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology,Inc. <br /> Owen C. Ratchye, _ 4�pFESS <br /> Project Engineer 4&; <br /> Q N T <br /> {r NO. C46725Diane 1 <br /> Principal EnguneeP.B. �jalE�CtC�1F�F�\� <br /> Attachment A:CPT Field Protocol <br /> cc: Mr.A.E. (Alex)Perez,Shell Oil Products Company,P.O.Box 8080,Martinez,CA 94553 <br /> G:1RiP3411Cammspundcncelwkpin_Add_3.wpd <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.