Laserfiche WebLink
Mr. Ron Rowe �•/ CAMBRIA <br /> July 11, 1997 <br /> • Analytic reports and chain-of-custody forms, <br /> • Soil and water disposal methods, and <br /> • A discussion of the hydrocarbon distribution. <br /> SCHEDULE <br /> Upon receiving written work plan approval from the SJCPHS, Cambria will obtain county permits and <br /> commence drilling. We will submit our investigation report about six weeks after completing the field work. <br /> We appreciate the opportunity to work with you on this project. Please-call if you have any questions or <br /> comments. <br /> Sincerely, <br /> Cambria Environmental Technology,Inc. <br /> ED GF�< <br /> ` N <br /> 'cn <br /> Owen C. Ratchye 2 © ''' <br /> Project Engineer No.5747 <br /> T� OF C Al-1FOP <br /> N. Scott cLeod <br /> Principal 'eologist <br /> F:\PROJECINSHELL\RfP341\well—wkpin.wpd <br /> Attachments: A-Standard Field Procedures <br /> cc: Mr. A.E. (Alex)Perez,Shell Oil Company,P.O. Box 4023,Concord,CA 94524-4023 <br /> 3 <br />