My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 4:14:33 PM
Creation date
3/6/2020 1:43:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004464
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> CAMBRIA <br /> i <br /> MASS REMOVAL BY GROUNDWATER EXTRACTION <br /> Constituent Total Removed <br /> Total Hydrocarbons 18 pounds <br /> MTBE 15 2 pounds <br /> Water 2,295,500 gallons <br /> ANTICIPATED SECOND QUARTER 2005 ACTIVITIES <br /> As approved by the San Joaquin County Environmental Health Department(SJCEHD) in a letter <br /> dated March 16, 2005, groundwater samples will no longer be collected monthly from well <br /> MW-6A Well MW-6A will now be sampled quarterly The SJCEHD also agrees that the <br /> groundwater extraction and treatment system should be dismantled and requests that a work plan <br /> or site closure report be prepared Cambna will submit a site closure report by June 1, 2005 <br /> Due to the possibility of case closure, SJCEHD does not believe it is necessary to change the <br /> present sampling schedule Therefore, Blame will gauge and sample the site wells according to <br /> the existing sampling schedule and tabulate the data Cambria will prepare a groundwater <br /> monitonng report <br /> CLOSING <br /> As requested in SJCEHD's March 21, 2005 letter, Cambria directs SCJEHD staff to our <br /> February 9, 2000 Well Installation Report This report documents the installation of wells <br /> MW-IA, MW-4B, MW-5A, MW-5B, -6A, and MW-6B, and includes the well log <br /> information <br /> 0324 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.