Laserfiche WebLink
C A M B R I A Mr. Ron Rowe <br /> March 6, 2040 <br /> ANTICIPATED FIRST QUARTER 2000 ACTIVITIES <br /> Ground Water Monitoring: Blaine will gauge and sample all wells and tabulate the data. <br /> Cambria will prepare a monitoring report. <br /> Interim Ground Water Remediation: .Blaine will continue weekly purging and sampling of <br /> onsite monitoring well MW-1 and onsite extraction well EW-1 until start up of the GWE system. <br /> Cambria will compile a table of analytical data and the number of gallons removed. <br /> Ground Water Remediation: Cambria will start up the GWE and treatment system. <br /> CLOSING <br /> We appreciate the opportunity to work with you on this project. Please call Owen Ratchye at <br /> (510)420-3316 if you have any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> c�S SAS. LES OGS <br /> 9wenRatchve 9� `'PA <br /> Project Engineer , <br /> �r N0.6717 <br /> �l�rF Q�• <br /> Ailsa S. Le May, R.G. of c A0° <br /> Senior Geologist <br /> Figure: 1 -Ground Water Elevation Contour Map <br /> Table: 1 - Ground Water Purging and Analytical Data <br /> 2-Ground Water Analytical Data- Oxygenate Compounds <br /> Attachment: A-Blaine Ground Water Monitoring Report and Field Notes <br /> cc: Karen Petryna,Equiva Services LLC, P.O. Box 7869 Burbank, CA 91501-7869 <br /> Marcus Pierce, RWQCB 3443 Routier Road, Sacramento, CA 9.58.27-309.8 <br /> Robert G. den Dulk, 2412 Avenue 360,Kingsburg, CA 93631 <br /> Dale Ramey, City of Ripon,259 North Wilma Avenue, Ripon, CA 9366 <br /> gArip 3411gm14g99qm.doc <br /> 2 <br />