Laserfiche WebLink
'r I <br /> C A M B R I A Mr Ron Rowe <br /> June 18, 1999 <br /> ANTICIPATED SECOND QUARTER 1999 ACTIVITIES <br /> Ground Water Monitoring Blaine will gauge and sample all wells and tabulate the data <br /> Cambria will prepare a monitoring report <br /> Ground Water Remediation Blaine will continue weekly purging of onsite monitoring well <br /> MW-1 and onsite extraction well EW-1 Cambria will compile a table of the number of gallons <br /> removed and analytical data <br /> Ground Water Pumping Test Cambria performed a ground water pumping test, including a <br /> step-discharge test and a constant discharge test on April 4 and 5, 1999 Cambria will submit a <br /> report on the test <br /> CLOSING <br /> We appreciate the opportunity to work with you on this project Please call Owen Ratchye at <br /> (510)420-3316 if you have any questions or comments <br /> • <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> i <br /> Owen C Ratchye S�,RED G foe <br /> Project Engineer �`` y5P 5 LES 0 <br /> * NO 6717 <br /> Ailsa S Le May, R G •'TFop CALNF�Q�` <br /> Senior Geologist <br /> Figure 1 - Ground Water Elevation Contour Map <br /> Tawe 1 - Grounu W dLtr L-111d1yL1l.d'1 DdLd -OXYgeltdLC L.U111PULUlds <br /> 2-Ground Water Purging and Analytical Data <br /> Attachment A -Blaine Ground Water Monitoring Report and Field Notes <br /> cc Karen Petryna,Equiva Services LLC,P O Box 6249, Carson, California 90749 <br /> g 1np 3411gm11g99qm doc <br /> 2 <br />