Laserfiche WebLink
- r <br /> r ELL MONITORING DATA StEET <br /> Project 9- p 1 o a-116 k �6 Client. <br /> Sampler ,'J, r, Start Date Lf- 6 -d j <br /> Well I D • v- Well Diameter 3 4 6 g <br /> Total Well Depth �- 9. s , <br /> P Depth to Water- ' .� n ti J <br /> Before After: Before. _ After <br /> Depth to Free Product Thickness of Free Product (feet) _ <br /> Referenced to: Grade ID.0 Meter (if req'd) YSJ , <br /> Purge Method } Sampling MethodBaile <br /> Bailer Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> i d a Extraction Pump Dedicated Tubmg <br /> Electric Submersible Other Other' <br /> Well Di' titer Mut firer Well DiMeter Multi her <br /> J(/ — 1. r- `004 z 14' 065(Gals)X - - �( Gals 2^ 116 6" 147 <br /> 1 Case Volume S ecified Volumes Calculated Volume 3" 4 37 ,, Other radius 2.0 163 <br /> Time Temp (°F) PH Cond Turbidity Gals. Removed Observations <br /> t `-rs.� `�. 9 --7. ► l �-� 6 <br /> 5240 <br /> 66 <br /> sal ~ �. �. � A E7 <br /> �r l <br /> Did well dewater? Yes 4n� Gallons actually evacuated �• J <br /> Sampling Time 13 J <br /> dJSampling Date <br /> Sample I D . ' v�I Labbrafory <br /> Analyzed for H-G B TPH-D Other G `~. !Y Or t�M• rr atl... <br /> 1V <br /> Equipment Blank I D . `r r=e Duplicate I D . <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br /> DO (if req'd)- Pre-purge Post-purge rt.U Mg/LL <br /> ORP (if req'd) Pre-purge MV Post purge MV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />