Laserfiche WebLink
i <br /> Geological Technics inc. <br /> Page 8 <br /> Soil Vapor Extraction <br /> Pilot Test Work Plan <br /> Project No. 770.2 <br /> September 17,2003 <br /> 5.0 SCHEDULE AND REPORTING <br /> r � <br /> L+ Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, USTCFP cost pre-approval and upon issuance of the borehole permits. The, <br /> information,gathered during this phase of work will be presented in a report, which will <br /> include a summary of the extraction test with vacuum:influence data. Dr. Ray Kablanow, a <br /> registered professional geologist, wil supervise the project. Copies of the report will be <br /> r forwarded to both the appropriate County and State regulatory agencies (SJCEHD and <br /> Lt CRWQCB-CVR). Groundwater monitoring, involving all of the site's wells, will occur on a <br /> quarterly basis. A report will be issued for each monitoring event and submitted to the <br /> County and State agencies. <br /> 6.0 SIGNATURES & CERTIFICATION <br /> If you have any questions or if we can be of further assistance, please do not hesitate to <br /> contact our office at(209) 522-4119. <br /> I <br /> This report was prepared by: <br /> Joseph Angulo <br /> Geologistp1FE55�0 <br /> cF <br /> R.I.KAB AVOW N °(O <br /> NO,5234 <br /> '3 <br /> Raynold I. Kablanow II, Ph.D. of ��F <br /> California Registered Geologist #5234' �' <br /> I <br /> Certified Hydrogeologist #442 <br /> i <br /> I <br /> I: <br /> I <br /> I <br /> I , <br /> J <br />