Laserfiche WebLink
GeologicalTeckicicslntc. Page 14 <br /> Bioventing/Biosparging <br /> L Pilot Test Work Plan <br /> Project No. 770.2 <br /> rr June 9,2006 <br /> 7.0 SCHEDULE AND REPORTING <br /> Geological Technics Inc, anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, USTCFP cost pre-approval and upon issuance of the borehole permits. The <br /> information gathered during this.phase of work will be.presented.in a report, which will <br /> include a summary of the pilots test with injection/extraction pressure/vacuum influence data. <br /> Dr Ray Kablanow,-a registered professional geologist, will supervise the project. Copies of <br /> the report will be forwarded to both the appropriate County and State regulatory agencies <br /> ( <br /> SJC PHS/EHD and CRWQ CB-CVR). Groundwater monitoring, involving all of the site's <br /> wells, will occur on a quarterly basis. A report will be issued for each monitoring event and <br /> submitted to the County and State agencies. <br /> 8.0 SIGNATURES & CERTIFICATION <br /> If you have any questions or if we can be of further assistance, please do not hesitate to <br /> contact our office at (209)522-4119: <br /> This report was prepared by: <br /> . � Dnuloj <br /> Joseph . �- . �.►----� � <br /> p 5!otAALFQ <br /> GeologistC. <br /> A. 'KA81.ANOW 11 <br /> NO.5234 <br /> Raynold 1. Kablanow 11, Ph.D. <br /> LCalifornia Professional Geologist #5234 <br /> Certified Hydrogeologist #442 <br /> L <br /> L <br />