Laserfiche WebLink
i <br /> C�¢ologkal TCckl a&C. Page 4 <br /> i <br /> Additional Site Characterization Work Plan <br /> ^ Project No.770.2 <br /> March 3,2005 <br /> C <br /> 3.4 Water Sampling <br /> Water sample depths will be targeted to complete a site conceptual model illustrating the <br /> lateral .and vertical extent of the groundwater plume at the site. A hydropunch type <br /> sampler will be used on the end of the drill rods to obtain samples at depths to be <br /> determined in the field. The sampler is attached to the end of the drill rods and then <br /> advanced to the targeted depth. When the targeted depth is achieved, the rods are <br /> retracted 12 — 18 inches to allow a screened portion of the.rods to be exposed and water <br /> to enter. A water sample will then be obtained from inside the rod column by lowering a <br /> small diameter bailer into the rods. Water samples will then be transferred from the bailer <br /> to the VOA container for transport to the laboratory. Care will be taken to .minimize <br /> sample agitation from the initial filling of the bailer to the transfer of the sample to the <br /> VOA vial..A description and schematic of the process is included in Appendix B. <br /> r <br /> 4: 3.5 Water Sample.Analyses <br /> A maximum of three groundwater samples from each borehole will be submitted,to a state <br /> certified laboratory for the analysis of: <br /> • Benzene,toluene,ethyl benzene and xylene'(BTEX)by EPA method 602/503.0 <br /> • Gasoline range petroleum hydrocarbons (TPH-G)by EPA method 5030/8015(m) <br /> • Total Extractable Petroleum Hydrocarbons by EPA method 8015M <br /> The detection limits for these compounds are listed below. A Chain of Custod will be <br /> P Y <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> Detection Limits: TEPH-D BTEX TPH-G <br /> Water(µ ) 50 0:370..6 50 <br /> L� 4.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> 4•� plan approval; cost pre-approval, from the USTCFP and issuance of the <br /> encroachment/monitoring well permits. <br /> The information gathered during this phase of work (CPT installation) will be resented in <br /> P P <br /> � ,/ the updated Site Conceptual Model (SCM) report.. <br />