Laserfiche WebLink
I <br /> CGeological rect"Ics Inc. <br /> Confirmation GW Sampling WP <br /> Project No.770.2 <br /> i <br /> February 28,2011 <br /> 3. SCHEDULE AND REPORTING <br /> Geological Technics Inc. anticipates initiating the DWR record request no later than 10 days <br /> after work plan approval, and beginning fieldwork no later than 30 days after work plan and <br /> client contract approval. If appropriate, the information gathered during this phase of work <br /> will be presented in a NFAR report as part of a Site summary_closure_report. Copies of the <br /> report will be forwarded tb-56th the appropriate County and State regulatory agencies (SJC <br /> PHS/EHD and CRWQCB-CVR). 1---- <br /> 4. SIGNATURES & CERTIFICATION <br /> Ifan ou have questions or if we can be of further assistance, please do not hesitate to <br /> Y Y <br /> contact our office at(209) 522-4119. <br /> L - <br /> This work plan was prepared by: <br /> c <br /> Ezaria a, B.S. Geology <br /> This report was prepared under the direction of: <br /> QROF ES SI 4 <br /> J. BR`�2,yc2. <br /> i <br /> N0.57205 <br /> Exp.'9/30/12 <br /> J f�T CIVIL <br /> r Tamorah Bryant,P. F of CA��Fo <br /> L <br /> - <br /> Geological recknics Inc. 7 <br />` 7702 Confirmation GW Sampling 2-25-11 <br />