Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> ..H <br /> 'm A ALX-SISMISRF0'RMEw.:'!:. <br /> P -N <br /> M, <br /> ........ .... <br /> ............... <br /> N,N <br /> Ml. . <br /> ..... <br /> bA & ' 1I <br /> ...Y.\.. <br /> M iLITER' <br /> E. <br /> L P T.- <br /> STUCK <br /> A cp <br /> t Li <br /> CLIENT- HUNTER &ASSOCIATE DATE: 05/17/1994 <br /> PROJECT MANAGER: BILL HUNTER SAMPLE LOCATION: MW-2 <br /> SAMPLER: DON LIGHT START TIME: <br /> GROUNDWATER: XXX kDOSE: OTHER: P.I.D. WELL HEAD 0.0 PPM <br /> CASING ELEVATION; (FEET MSL) 25.61' CASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 69.42 FEET CALCULATED PURGE VOLUME., 2.6 GAL. <br /> 11DEPTH OF WELL. 89.80 FEET <br /> 1ACTUAL VOLUME PER PURGE: 2.5 GAL. <br /> ....................... ............ <br /> H <br /> M <br /> ,...0 <br /> T <br /> _ot <br /> U <br /> C. <br /> M.,............... <br /> "Itib fidi"'i <br /> .10 7.5 917 19.8 BRN TURBID NO ODOR <br /> ';2.5 7.5 926 19.3 <br /> `L5.0 7.5 926 18.9 <br /> 7 <br /> ;17.5 7.5 926 18.9 <br /> PURGE METHOD : 3 FOOT STAINLESS STEEL BAILER. <br /> SAMPLE METHOD: I 1 FOOT STAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE:i:! DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP & SEAL ARE SECURE / LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: OVERCAST SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH A STEAM CLEANER AND ALCONOX. <br /> GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: AT THE SOUTHERN CORNER OF FACILITY. <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7-0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> IL <br />