Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> ............... . <br /> - ... .. <br /> 4T ALYSI : . ...1. : .7f <br /> .............. <br /> ............ <br /> A 94x6 <br /> -1 . .. . ......... <br /> .'"". ".".,.......... <br /> .T.... <br /> 11 k.1w ............ . <br /> OUT <br /> . .......... <br /> A-.0 <br /> VID <br /> EV <br /> V <br /> A <br /> a i 9A l <br /> Tr. <br /> 7 . ETEb'by 1, O <br /> .............O <br /> ..........N <br /> - ......... ......... <br /> ....... <br /> ' <br /> CLIENT. HUNTER & ASSOCIATE DATE: 06/17/1994 <br /> PROJECT MANAGER BILL HUNTER .: SAMPLE LOCATION: MW-3 <br /> SAMPLER; DON LIGHT START TIME: <br /> GROUNDWATER: XXX -FADOSE-, OTHER: P.I.D. WELL HEAD 0,0 PPM <br /> C <br /> ASING ELEVATIONCASING DIAMETER: 2 INCH <br /> DEPTH TO WATER: 68.96 FEET CALCULATED PURGE VOLUME: 2.04 GAL. <br /> DEPTH OF WELL: 81.48 FEET <br /> �CTUAL VOLUME PER PURGE: 2.0 GAL. <br /> ............. . <br /> ............ <br /> .......... <br /> ..... .... <br /> V. . 'XlX:­Xo...' <br /> ................... <br /> 0 7.6 883 18.6 BRN TURBID NO ODOR <br /> .12 7.6 880 18.6 <br /> 4 7.6 877 18.5 <br /> 6 7.5 876 18.4 <br /> PURGE METHOD : 3 FOOT STAINLESS STEEL BAILER. <br /> SAMPLE METHOD: 1 FOOT STAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP & SEAL ARE SECURE / LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: OVERCAST SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> i IN THE FIELD WITH A STEAM CLEANER AND ALCONOX. <br /> I GLOVES WERE WORN AT ALL TIMES. <br /> WELL :LOCATION: <br /> . NORTH EAST CORNER OF FACILITY, <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION-. ORION pH/TEMPERATURE METER 2 'POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br />