Laserfiche WebLink
Gcological ncfmics w. Page 3 <br /> Site Characterization Work Plan <br /> f Cardoza(Louise) <br /> L Project No.,1135.2 <br /> December 2,2003 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than'30 days after USTCFP <br /> approval and upon issuance of the drilling permit. The information gathered during this <br /> phase of work will be presented in a report, which will include,a summary of the geology as <br /> well as the results of sample analyses. Based on this information, GTI will make <br /> recommendations for further additional investigation work if necessary. Dr. Ray Kablanow, <br /> a registered professional geologist, will supervise the project. . Copies of the reports will be <br /> forwarded to both the appropriate County and State regulatory agencies (SJC PHS/EHD and <br /> CRWQCB). <br /> L.� <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect'at.the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> rr This work plan was prepared by: <br /> L.� <br /> J e 4D. Ang 1 <br /> Geologist Q�Or-ESSIO�! <br /> cF0 <br /> h� R.t.KAB►Af`td1N II �p <br /> N0.5234 <br /> Raynold L Kablanow II, Ph.D. *s $'3f•s�-{ �P <br /> California Registered Geologist#5234 l4�OF cp'lft <br /> Registered Environmental Assessor#901 <br /> - I <br /> J <br /> U <br />