Laserfiche WebLink
I) 1 1 <br /> 7020 Koll Center Parkway, Suite 134, Pleasanton, CA 94566-3107 (925)426-5395 FAX (9251426-5391 <br /> • <br /> Compliance <br /> & <br /> WEDClosure, Inc. <br /> October 23, 2001 <br /> NOV 13 2001 <br /> ENVIRONMENT HEALTH <br /> San Joaquin County PERMIT/SERVICES <br /> Public Health Services, Environmental Health Division <br /> 304 E Weber Avenue, 3rd Floor <br /> Stockton, California 95202 <br /> Attention Ms Lori Duncan <br /> Subject Fourth Quarter 2001 Groundwater Monitoring Report <br /> Quak Stop No 121 <br /> 1196 West Louise Avenue, Manteca, California <br /> (CCI Project No 12118-2) <br /> Dear Ms Duncan <br /> Compliance & Closure, Inc (CCI) is pleased to present the Fourth Quarter 2001 Groundwater <br /> Monitoring Report for the sampling of twelve on and off-site groundwater monitoring wells at <br /> Quik Stop Market No 121, located at 1196 West Louise Avenue in the City of Manteca, San <br /> Joaquin County, California(Figure 1) CCI completed the well sampling in accordance with <br /> requirements of the San Joaquin County Public Health Services, Environmental Health Division <br /> (County) on October 4, 2001 It should be noted that monitoring well MW-8, located on the <br /> south side of the Quik Stop Market (Figure 2), was found to be dry this quarter On September <br /> 28, 2001, CCI installed well MW-12 on the northwest corner of West Louise Avenue and Union <br /> Avenue (Figure 2) The well has been developed and sampled and the data are included in this <br /> report <br /> Groundwater samples were collected from the twelve wells in accordance with XI's <br /> Groundwater Sampling Protocol (Appendix A) The groundwater purged from each well and <br /> equipment rinse water were placed in a properly labeled, Department of Transportation- <br /> approved drum and left at the site pending laboratory results A summary of the°groundwater <br /> purge data is presented in Table 1 <br /> Well Installation <br /> CCI installed one additional shallow aquifer well on the northwest corner of West Louise <br /> Avenue and Union Avenue The well(MW-12) was installed to a depth of 30 feet to monitor the <br /> shallow aquifer at that location CCI contracted witiPPtecision Sampling, Inc (Precision) of <br /> Richmond, California to install a pre-pack, 3/4-inch diameter,well using it's Vibra Push MD <br /> Recyclable and made tram recycled panel <br />