My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2901
>
3500 - Local Oversight Program
>
PR0545440
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 4:33:37 PM
Creation date
3/9/2020 2:22:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545440
PE
3528
FACILITY_ID
FA0003845
FACILITY_NAME
MUSD-DISTRICT OFFICE
STREET_NUMBER
2901
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19811004
CURRENT_STATUS
02
SITE_LOCATION
2901 E LOUISE AVE
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> SCHEDULE <br /> Kleinfelder could initiate drilling activities within approximately 3 to 5 working days of <br /> receiving written authorization to proceed by the client and the PHS/EHD. Our report of the <br /> temporary monitoring well installation and groundwater sampling will be submitted for client <br /> review within 10 to 15 working days of receiving analytical results. Verbal results can be <br /> provided upon our receipt of the analytical data. The estimated completion time for Tasks 1 <br /> through 4 is approximately 3 to 5 weeks from approval by the client and.PHS/EHD. <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This proposal and the attached cost estimate is based on the following assumptions: <br /> Manteca Unified School District will assist Kleinfelder in obtaining access to the site and <br /> owner authorization for the proposed sampling. <br /> Adequate work space and access will be provided. Kleinfelder will attempt to advance <br /> soil borings and collect samples at the proposed locations. If the drilling equipment <br /> cannot be positioned, alternative drilling locations or sampling methods should be <br /> I <br /> investigated. I <br /> • The borings are to'be drilled with a truck mounted drill rig equipped with hollow stem <br /> i <br /> - _ augers, or sampled using a hand auger and slide.hamnier. If difficult drilling <br /> conditions <br /> are encountered, alternative sampling methods may be necessary. <br /> ti <br /> • Soil and water generated during the drilling and sampling will be the responsibility of the <br /> client. Soil cuttings and steam cleaning water will be left on site. Sampling and analysis <br /> of the contained soil and water may be necessary. prior to disposal. Disposal or <br /> remediation options for the soil and water can'be assessed once analytical results have <br /> been received. Kleinfelder is prepared to assistthe client and to remediate or dispose of <br /> stockpiled soil and water, if requested, at anadditional charge. <br /> Ik This proposal is based on the presumption that Manteca Unified School District will <br /> clearly mark utilities and will provide any and all available survey maps or other data to <br /> I determine the location of tanks, existing structures, underground utilities and services. <br /> A <br /> i <br /> • The client should be aware that penetrating the site's surface is inherently risky. It is <br /> impossible to determine with certainty the precise location of all structures (such as septic <br /> system tanks or leach fields) which may be buried in the ground. Kleinfelder's fee is not <br /> adequate to compensate for both the performance of the services and the assumption of <br /> risk of damage to such structures. <br /> I <br />! 20-YP8-I61I2018P179 P2-Se A-4 <br /> © 1998, Kleinfelder,Inc, June 22, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.