My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
18043
>
3000 – Underground Injection Control Program
>
PR0521597
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 1:23:47 PM
Creation date
3/10/2020 10:33:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0521597
PE
3030
FACILITY_ID
FA0014673
FACILITY_NAME
RANCHOD PROPERTY
STREET_NUMBER
18043
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
18043 S MANTHEY RD
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O1 August 2003 <br /> AGE-NC Project No. 03-1025 <br /> Page 2 of 4 <br /> In addition, a health and safety plan will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational <br /> Safety and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, <br /> 1985). <br /> 3.2. SOIL SAMPLE COLLECTION AND ANALYSIS <br /> AGE proposes to advance nine soil borings utilizing GeoProbe"direct push"techniques:one boring <br /> will be advanced angling beneath the septic tank, and one boring will be located under the <br /> distribution box (D-Box). The leach line borings will be located directly below the leach line <br /> trenches at 20 foot intervals along the entire length of each trench. Each boring will be advanced to <br /> approximately 2 feet into native soil directly underneath each sampling area. If groundwater is <br /> encountered a water sample will be collected and analyzed. The proposed boring locations are <br /> illustrated on Figure 2 - Site Plan. The proposed boring locations may be modified due to exact <br /> location of septic system, and requests of SJC EHD. <br /> Soil samples and water sample if collected; will be submitted for laboratory analysis. The samples <br /> will be analyzed by a State of California Department of Health Services(DHS)certified laboratory <br /> for the following constituents: <br /> • Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d) in <br /> accordance with EPA Method 8015 Modified; <br /> • Total petroleum hydrocarbons quantified as oil and grease (TPH-o&g) in accordance with <br /> EPA Method 8015 Modified; <br /> • Total recoverable petroleum hydrocarbons(TRPH)in accordance with EPA Method 418.1, <br /> carbon chain C-6 through C-40; <br /> • Full scan 8260b, reporting all peaks; and <br /> • pH in accordance with EPA Method 150.1. <br /> Laboratory reports for soil analysis, testing methods, laboratory quality assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report of <br /> findings and recommendations. <br /> Advanced GeoEnviron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.