Laserfiche WebLink
.aY, c s a# <br /> r <br /> r will be used; the <br /> auger drilling egLaiPmen. The <br /> �iESNR Co. attached to this workplan. hu t❑ <br /> Plate VIII. lication is eriy prepared flig <br /> htl�drilling permit app <br /> Ad with sufficient Png. Equipment will also <br /> rig will be eq all sampler for <br /> complete the well �iithout steam clesplit Spoon <br /> obtaining sail samples. A core <br /> include an 18" California Modified p attire of the <br /> holding 2" metal tubes far the unconsolidated n <br /> catcher may be needed due to <br /> soils to be Penetrated- the <br /> b the �:G on location; <br /> be described Y which is the depth <br /> 2, Sails penetrated will tills, and i' <br /> first soil sample will be collected Om at10" <br /> tank P in <br /> were taken {hest measuat 15red water table <br /> that previous samples ❑f the hig ' , 20' , and <br /> depth approximately the p les will also be <br /> years. Soil camp taken at <br /> P05 <br /> as close to t <br /> sible; (recently meas <br /> recent ured <br /> he water table a� p <br /> 22' bgl' 3 promptly sealed & <br /> All samples will be described by the FG, <br /> r_ ending transport to a State Cl ba{led <br /> laced on i e p of the work, the samples will with <br /> labeled, and p f custody, <br /> laboratory• upon compleory under proper chain a <br /> delivered to the laboratory <br /> instructions to test far BTE% and TP}-i"g• laced in <br /> augering operations will en placed <br /> removed during Site pending <br /> 4. Spoils the drilling <br /> properly marked ? sealed Anymfluidssproduced during drums. <br /> analyses. in separate <br /> o{ laboratory stations will also be stored <br /> :�. completion op 2" OD screw--type, <br /> operation? <br /> ravel <br /> ,, R{ter will be installed and late <br /> � completion of the boring <br /> interior flush, blank slatted PVC the water <br /> E+ completed a5 shown an the schematic <br /> will be about above <br /> s packed, cema .oed, ravel <br /> IX. The top of the perforations The hale will be g <br /> with approximately t0 feet below. Seal, and cemented tc+ <br /> table, tilted, capPed with a bentonite expanding lacking <br /> packed as req i e will be sealed with an will will be placed <br /> the surface. The P P Christy surface. <br /> a suitable surface vault ' lace, flush with the <br /> cap and and cemented in place,the well properly labeled <br /> around the casing side of the PVC will be <br /> A traffic cover will ti n. Theenor•th <br /> for future identification• reference Point' <br /> notchedfor 'ase as a survey developed by swabbing <br /> Within 18 to 24 hours, the well will bedeveloped <br /> for at least 15 <br /> 6. suitable equip a stations will be <br /> with a hard rubber disk d during the swabbing peratio red on site <br /> minutes. Water <br /> placed in properly labeled Yr. sealed drums an <br /> laboratory results, <br /> pending after bailing at least <br /> Groundwater will be sampled and tested <br /> 5 <br />