My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
3500 - Local Oversight Program
>
PR0545484
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:13:08 PM
Creation date
3/10/2020 11:03:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545484
PE
3528
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHEVRON U.S.AODUCTS CO. <br /> Page 2 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective <br /> action alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative <br /> required by the regulatory agency to achieve the minimum cleanup necessary to protect <br /> human health, safety and the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated <br /> immediate hazard to public health, or the environment._Program regulations allow the <br /> responsible party to undertake interim remedial action after: (1)notifying the regulatory agency <br /> of the proposed action, and; (2)complying with any requirements that the regulatory agency may <br /> set. Interim remedial action should only be proposed when necessary to mitigate an immediate <br /> demonstrated hazard.Implementing interim remedial action does not eliminate the <br /> requirement for a CAP and an evaluation of the most cost-effective corrective action <br /> alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory <br /> agency to protect human health, safety and the-environment can be claimed for reimbursement. <br /> You must comply with all regulatory agency time schedules and requirements and you must <br /> obtain three bids for any required corrective action. Unless waived in writing,you are required <br /> to obtain preapproval of costs for all future corrective action work. If you do not obtain three <br /> bids and cost preapproval, reimbursement is not assured and costs may be rejected as <br /> ineligible. <br /> I <br /> I <br /> If you have any questions, please contact me at(916)227-4334.. <br /> Sincerely, <br /> I <br /> 4n/ntabel Mackey <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr.Gordon Boggs tis. Margaretaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> I <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> • Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br /> C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.