My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:13:06 PM
Creation date
3/10/2020 2:48:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-22-1999 10:15 P.05/05 <br /> ,Bos n Capitat lv OUNG&W....,..r....,_ rroicuk, . -. <br /> -- <br /> No Main Street Plaza,Marteca^ aifarna w1 1 <br /> . I <br /> .2. Investigation'RequifteQents Not Satisfied <br /> inyo and Moore has conducted this ESA in conformance vrith the Phase I ESA and Repoli <br /> Scope of Work. All requirements, as outlined in Exhibit A of the scope of work,have been <br /> satisfied. <br /> 16.3. Actual or Potential Sources o[Liability Potential sources,of liability have been <br /> Based on the results of this Phase I ESA,no actual or Pm <br /> identified at the site other than those discussed in Section 6.1. above. <br /> 6.4. Actual or Potential NoncomPliaaee Issues <br /> No actual or potential noncompliance issues were observed during the site reconnaissance or <br /> disclosed in the database or title search. <br /> i 6.5. Recommendations for Farther Investigatio as,Testing or Analysisns are made for <br /> At this time, based on the results of the Phase I ESA, no recontmead <br /> further investigations,testing or analysis. <br /> 6.6. Unommendations for Regulatory Repotting <br /> At thio time, based on the results of the Phase I ESA, no recommendations are made for <br /> regulatory reporting- <br /> - Compliance Actions <br /> 6.y. commendations for other Comp <br /> At this time,based on the results of the Phase I ESA,Ninyo&Moore ret°stunenda8°us that <br /> I permit in accordance <br /> the three grourAwawr monitoring wells at the site be abandoned under pe <br /> with local laws and regulations. The estimated cost to abandon the wells is$2,00.E <br /> ZS <br /> awza•t sxx <br /> TOTAL P.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.