My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:03:36 PM
Creation date
3/10/2020 2:50:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Consultants, Inc. <br /> Health & Safety Plan <br /> Page. 2 <br /> (' 2. Assuring that personnel are aware of the provisions of this plan, are <br /> instructed in the work practices necessary to ensure safety, and in <br /> planned procedures for dealing with emergencies. <br /> 3. Assuring that personnel are aware of the potential hazards associated <br /> y with site operations. <br /> 4. Monitoring the safety performance of all personnel to ensure that the <br /> required work practices are employed. <br /> 5. Correcting any work practices or conditions that may result in injury or <br /> Y J rY <br /> exposure to hazardous substances. <br /> 6. Preparing any accident/incident reports (see attached Accident Report <br /> Form). <br /> 1.4 Project Employees <br /> Project Employees involved in on-site investigations are responsible for: <br /> 1. Taking all reasonable precautions to prevent injury to themselves and to <br /> their fellow employees. <br /> 2. Implementing Health and Safety Program and reporting to the PSO for <br /> any action deviating from the anticipated conditions described in the <br /> Health and Safety Plan. <br /> 1.5 Speciallnstructions <br /> It is the responsibility of the Project Manager and the Health and Safety <br /> Manager to review the available site information to determine, to what degree <br /> the Health and Safety Plan will be implemented. Each site will be handled on a <br /> case by case basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.