Laserfiche WebLink
i <br /> VVHF Environmental Consultants, Inc. <br /> Health & Safety Plan <br /> Page. 3 <br /> ' 2.0 SAFETYIMPLEMENTATION <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to <br /> S� determine whether specific amendments are to be made to the Health and Safety Plan <br /> �- based on specific characteristics which may exist on the job site. Any suspected <br /> hazards associated with the on-site operation which exposure to, via inhalation or skin <br /> absorption, to such as suspected carcinogens or human sterilants, will be documented <br /> and specific guidance will be developed and added to this Health and Safety Plan as <br /> -, Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> P J Y <br /> investigations. The project site layout has built-in safety features. The site is divided <br /> into three zones. The following list defines the required personnel protective <br /> equipment. <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager: <br /> - Coveralls as an undergarment <br /> [' - Saranex outer garment <br /> Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> Steel toe boots <br /> Robars or Tingley boots <br /> - Full facepiece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br />