My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005184
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0005184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 7:33:30 AM
Creation date
3/10/2020 3:42:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005184
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND QUARTER 2003 <br /> GROUNDWATER MONITORING REPORT <br /> AND ADDITIONAL ASSESSMENT REPORT <br /> JAIVIAR OIL DLSTRMUTION <br /> JUNE 2003 <br /> In April 2002, GHH Submitted an Additional Assessment Workplan in response to County <br /> directives for additional investigation at the site. The County approved the workplan in a letter <br /> dated May 28, 2002. <br /> On January 13-16, 2003, three cone penetrometer borings (CPT) and three geoprobe borings were <br /> advanced to depths between 104-feet below ground surface (bgs) and 122-feet bgs. General <br /> lithology logs generated with a CPT computer program showed little geologic or hydrologic <br /> variation between borings. Groundwater samples collected documented that the eastern limit of <br /> MTBE- impacted groundwater was not defined. A southeastern limit to MTBE impacted <br /> groundwater was defined on the southeast comer of East Main Street and Oro Avenue. <br /> SCOPE OF WORK <br /> The following is a brief summary of the scope of work authorized by JAMAR, which consisted of <br /> completing the extraction well installation on May 19, 2043, completing the installation of the two <br /> sets of clustered monitoring wells on May 20-23, 2003, conducting three slug tests and five aquifer <br /> performance tests on May 22, 2003 and conducting second quarter groundwater monitoring on <br /> May 29, 2003. <br /> i <br /> Extraction Well and Monitoring Well Installation <br /> • Prepare a site specific health and safety plan (HSP). <br /> • Obtain necessary boring and well permits from San Joaquin County (County). <br /> • Obtain encroachment permit from San Joaquin County for monitoring wells. <br /> • Obtain Underground Service Alert(LISA) clearance. <br /> • Drill and install onsite extraction well EW-1 and off-site, clustered, monitoring wells <br /> MW-6A, MW-6B, MW-7A and MW-7B. <br /> • Develop the groundwater monitoring wells. <br /> • Survey the elevation of new groundwater extraction well and monitoring wells. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.