Laserfiche WebLink
i <br /> . THIRD QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> NOVEMBER 2002 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering, Inc <br /> 11960 Heritage Oak Place#2B <br /> Auburn,California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineering,Inc Mr Thomas E Ballard(R G 47299), <br /> Principal Geologist, is the qualified person responsible for overseeing this project This report <br /> r was written by Ms Heidi Hubbard, Geologist, and reviewed for technical content by Mr Ballard <br /> The analysis, conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation,persons knowledgeable about the site, <br /> and local government agencies However,the regulatory agencies may have additional <br /> recommendations after they have reviewed and evaluated the data All information presented is <br /> believed to be factual unless proven otherwise This report was prepared to assist the property <br /> owner in the evaluation of the site <br /> This report has been reviewed by the client and they concur with the findings herein If you have <br /> any questions or need additional information,please call GHH at(530) 886-3100 <br /> Thank You, <br /> H idi D Hubbard <br /> Geologist <br /> TAK <br /> r <br /> I <br /> Thomas E Ball R G OF C�� <br /> Executive Director <br /> F151871TB11n1ReportslQMR3rdQtr2002 <br /> PC- Mr Marty Hartzell, CVRWQCB (Regional Board) <br /> . Ms Lon Duncan, San Joaqum County <br />