Laserfiche WebLink
. THIRD QUARTER,2401 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> JANUARY 2042 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering, Inc <br /> 11960 Heritage Oak Place 92B <br /> Auburn, California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineering, Inc Mr Thomas E Ballard(R G #7299), <br /> Principal Geologist, is the qualified person responsible for overseeing this project This report <br /> was written by Mr Kirk E Moberg,Project Engineer, and reviewed for technical content by Ms <br /> Heidi Hubbard, Supervising Geologist and Mr Ballard <br /> The analysis,conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation, persons knowledgeable about the site, <br /> and local government agencies However, the regulatory agencies may have additional <br /> recommendations after they have reviewed and evaluated the data All information presented is <br /> believed to be factual unless proven otherwise This report was prepared to assist the property owner <br /> in the evaluation of the site <br /> This report has been reviewed by the client and they concur with the findings herein If you have <br /> any questions or need additional information, please call GHH at(530) 886-3100 <br /> Thank You, <br /> I ZHubbard �\�,��RED GFoeo <br /> Su Geologist cr c <br /> �MR3� <br /> VV <br /> .i <br /> Ata nV <br /> Thomas 0 Ballar , G <br /> Executive Director 9�Foo���P <br /> CAL1F <br /> F 151871TN\ln1QMR3rdQTR2001 <br /> PC Mr Marty Hartzell, CVRWQCB (Regional Board) <br /> Ms Lon Duncan, San Joaquin County <br /> i <br />