Laserfiche WebLink
t <br /> TFIIRD QUARTER,2001 <br /> ' GROUNDWATER MONITORING REPORT <br /> JA IAR OIL DISTRIBUTION <br /> SEPTEMBER 2001 <br /> PREPARATION OF REPORT <br /> ' Firm Preparing Report: <br /> GHH Engineering,Inc <br /> 11960 Heritage Oak Place#2B <br /> Auburn, California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engmeenng,Inc Mr Gary H Hall(RCE#27011),Principal <br /> Engineer,is the qualified person responsible for overseeing this project This report was written <br /> by Mr Kink E. Moberg,Project Engineer, and reviewed for technical content by Mr Hall and Mr <br /> Thomas E Ballard,Project Manager <br /> ' The analysis, conclusions and recommendations submitted in this report are based upon the best <br /> available inforniation obtained from the field investigation, persons knowledgeable about the site, and <br /> I ' local government agencies However,the regulatory agencies may have additional recommendations <br /> after they have reviewed and evaluated the data. All information presented is believed to be factual <br /> unless proven otherwise This report was prepared to assist the property owner in the evaluation of <br /> the site <br /> This report has been reviewed by the client and they concur with the findings herein If you have any <br /> questions or need additional information,please call GHH at (530) 886-3100. <br /> ' You, <br /> Q� ESS/p <br /> Gary Hall, P E <br /> Presnd tcqGA <br /> Thomas E.Ballard, <br /> sy �z <br /> Project Manager q CMI. <br /> F 1518711n1QMR3rdQTR0901 OF C Al-1F <br /> PC Mr Marty Hartzell, CVRWQCB (Regional Board) <br /> Ms Lon Duncan, San Joaquin County <br /> • <br /> 7 <br /> I i <br />