Laserfiche WebLink
h , <br /> SECOND QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> AUGUST 2002 <br /> Summary of Previous Investigations <br /> In 1995, a 300 gallon waste oil UST and a 500 gallon kerosene UST were excavated and <br /> removed from the site No environmental issues were documented with the removal of these <br /> tanks In December 1998 two 6,000 gallon and one 10,000 gallon gasoline USTs were excavated <br /> and removed from the site and replaced with a two compartment 20,000 gallon UST meeting <br /> EPA and State of California upgrade requirements Soil samples taken in conjunction with the <br /> tank removal contained detectable concentrations of petroleum hydrocarbons and on January 27, <br /> 1999, an Unauthorized Release form was filed with the County An additional Unauthorized <br /> Release was filed with the Country on June 11, 1999 <br /> In response to a directive from the County,John P Cummings &Associates (JPCA) conducted a <br /> subsurface investigation on September 8-9, 1999, by installing and sampling three monitoring <br /> wells(MW-1,MW-2,and MW-3) MW-1,MW-2, and MW-3 were drilled to approximately 78 <br /> feet bgs,74 feet bgs,and 74 feet bgs,respectively and sampled every 5 feet Groundwater <br /> samples were collected from the three wells on September 23, 1999 <br /> • On August 21,2000,JPCA did a further subsurface investigation by drilling and sampling one <br /> soil boring(B1) and installing and sampling two additional monitoring wells (MW-4 and <br /> MW-5) The soil boring was drilled to approximately 115 feet bgs and sampled every 5 feet <br /> MW-4 and MW-5 were drilled to approximately 75 feet bgs with soil samples collected every 5 <br /> feet Groundwater samples were collected from MW-1,MW-2,MW-3,MW-4 and MW-5 on <br /> August 30, 2000. The results of this investigation are documented in JPCA's 2"d Phase II <br /> Environmental Assessment Report dated October 25, 2000 <br /> GHH assumed environmental consultmg responsibilities for the site in July 2001 <br /> In April 2002, GHH Submitted an Additional Assessment Workplan m response to County <br /> directives for additional investigation at the site The County approved the workplan in a letter <br /> dated May 28,2002 <br /> SCOPE OF WORK <br /> Groundwater monitoring and sampling activities were conducted at the site on June 11, 2002. <br /> The following is a brief summary of the scope of work authorized by JAMAR. <br /> Measure depths to groundwater in monitoring wells MW-1 through MW-5 <br /> Purge a minimum of three equivalent well volumes of groundwater from each of the <br /> . wells and monitor for pH,temperature and conductivity <br /> Collect groundwater samples from the monitoring wells <br /> 2 <br />