My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005259
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0005259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:13:42 PM
Creation date
3/10/2020 3:56:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005259
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAIVIAR OIL DISTRIBUTION <br /> AUGUST 2002 <br /> • Analyze water samples from the five monitoring wells for total petroleum <br /> hydrocarbons as gasoline and TPH G,benzene,toluene, ethylbenzene, and xylenes <br /> (BTEX), 8260 Oxygenates (MTBE,TBA,DIPE,ETBE,TAME),EDB, and 1,2 <br /> DCA <br /> • Prepare this QMR for submittal to the County and Regional Board <br /> GROUNDWATER MONITORING <br /> Groundwater Elevations <br /> Prior to gauging depths to groundwater,the groundwater monitoring wells were checked for the <br /> presence of free floating hydrocarbons using an interface probe No free product was present in <br /> any of the wells Depths to groundwater measurements were then taken from each well from <br /> surveyed marks on the casing using an electric water level sensor or interface probe <br /> • Monitoring Well Purging <br /> The wells were purged using a 2-mch diameter submersible groundwater pump until a minimum <br /> of three equivalent well volumes of water were removed from each well Groundwater purged <br /> from the wells was placed into DOT approved 55-gallon drums and stored on-site,prior to <br /> disposal by USA. During the groundwater purging operations,physical parameters such as pH, <br /> temperature and conductivity were monitored and recorded on field data sheets,wbnch are <br /> included in Appendix A <br /> Groundwater purging was discontinued when the physical parameters indicated above appeared <br /> to stabilize in the purged groundwater To reduce the potential for cross contamination between <br /> wells, all purging and sampling equipment were washed in a trnsodnum phosphate solution and <br /> rinsed in potable water prior to each usage <br /> Groundwater Sampling <br /> Prior to sampling,the wells were allowed to recharge to a minimum of 80%of their initial static <br /> water levels Groundwater samples were collected from each well using a new disposable bailer <br /> The samples were placed into the appropriate laboratory prepared containers, using proper <br /> sample handling and chain-of-custody(COC)protocol established by the USEPA The samples <br /> were labeled with the date,time, identifying well number,stored in a cooler at 4' Centigrade or <br /> less, and transported to a state certified laboratory under completed COC documentation <br /> • <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.