My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012511
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0012511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 7:14:10 AM
Creation date
3/10/2020 3:57:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012511
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THIRD QUARTER, 2003 <br /> . GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> NOVEMBER 2003 <br /> GROUNDWATER MONITORING <br /> i <br /> Groundwater Elevations <br /> Prior to gauging depths to groundwater, all of the groundwater monitoring wells and the <br /> extraction well were checked for the presence of free floating hydrocarbons (free product) using <br /> an interface probe. No free product was present in any of the wells. Measurements of depths to <br /> groundwater were then taken at each well from surveyed marks on the casing using an electric <br /> water level sensor or interface probe. Depth measurements were taken prior to the purge start ) <br /> times recorded on the field data sheets included in Appendix B. 1 <br /> Monitoring Well Purging <br /> The wells were purged using a 2-inch, Rediflo submersible pump until a minimum of three <br /> equivalent well volumes of water were removed from each well. Groundwater purged from <br /> the wells was placed into DOT approved 55-gallon drums and stored on-site, prior to disposal <br /> by GHH. <br /> During the groundwater purging operations, physical parameters such as pH, temperature and <br /> conductivity were monitored and recorded on field data sheets, which are included in Appendix B. <br /> Groundwater purging was discontinued when the physical parameters indicated above appeared to <br /> stabilize in the purged groundwater. <br /> To reduce the potential for cross contamination between wells, all purging and sampling equipment <br /> were washed in a trisodium phosphate solution and rinsed in potable water prior to each usage. <br /> Groundwater Sampling <br /> Prior to sampling, the wells were allowed to recharge to a minimum of 80% of their initial static <br /> water levels. Groundwater samples were collected from each well using a new disposable bailer. <br /> The samples were placed into the appropriate laboratory prepared containers, using proper sample <br /> handling and chain-of-custody(COC) protocol established by the USEPA. The samples were <br /> labeled with the date, time, and identifying well number; stored in a cooler at 4' Centigrade or less, � <br /> and transported to a state certified laboratory under completed COC documentation. _ <br /> • <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.