Laserfiche WebLink
1 <br /> Date Name Acct Code Hours Comments . <br /> 03/29/96 M. Infurna 215 . 1.3 Reviewed 41 Quarter Monitoring <br /> Report for 12/7/95 event. DTW/MW-1 = <br /> 73.18' bgs. MW-2 only well with hits. <br /> TPH-G= 24,000 ppb and Benzene <br /> =9,100 ppb. Groundwater gradient to <br /> East, at <.001'/foot. <br /> 04/15/96 M. Infurna 212 0.4 Gary Barker calls to verify drilling. No <br /> EHD permits issued yet. Still need City <br /> encroachment permit update. <br /> 04/30/96 M. Infurna 215 0.4. Envisions data entry for off-site permit <br /> entered in anticipation of City permits <br /> being received. SR# assigned. <br /> 05/01/96 M. Infurna 212 0.0 Dave Higgins, Horizon, calls to make <br /> appointment to drill on 5/7 and 5/8 and ' <br /> leaves message on MI voice mail. City <br /> representative, Jason Ender calls and <br /> advises that permits are ready but <br /> Horizon to physically pick up <br /> paperwork. <br /> i <br /> 05/02/96 M. Infurna 212 0.5 Call to Horizon to notify that EHD to <br /> have actual permits on file from City <br /> prior to issuing any EHD boring <br /> I <br /> permits. As of today, no permit issued <br /> by EHD for proposed 5/7 drill date. <br /> I <br /> 05/03/96 M. Infurna .212 0.8 Dave Higgins, Horizon calls leaves <br /> phone voice mail that City has issued <br /> their permits. MI calls Jason Enders <br /> and verifies, but City requires physical <br /> pick up of permits and consultation. ' <br /> 05/06/96 M. Infurna 215 1.5 Jason Enders faxes encroachment <br /> permit#63483 for two off-site MWs (#4 <br /> and #5) in City ROW and not in traffic <br /> lane. MI issues permit SR#008601 to <br /> Horizon check#880 for off-site work <br /> and permit SR#008600 to Horizon <br /> check #967 for on-site soil borings.: <br /> Permit copies hand delivered to Gary { <br /> Barker on other Beacon site <br /> i <br />