Laserfiche WebLink
Date Name Acct Code Hours Comments <br /> 05/09/96 M. Infurna 210 3.1 MI on-site for drilling of MW-4 in street <br /> during the am. Back in the afternoon <br /> for well grouts to MW's 4 and 5. <br /> 06/18/96 M. Infurna 215 1.1 First Quarter-1996 Monitoring Report <br /> reviewed. Sampling event on 3/28/96. <br /> ' s.. GW <br /> DTW/MW-1 - 69.13bg gradient <br /> to the East (previously to the West) at <br /> <0.001'/foot. DTW about 6' over <br /> screened interval of wells. MW-2 only <br /> well with hits. TPH-G = 16,000 ppb and <br /> Benzene = 6,500 ppb (down from last <br /> quarter). No MTBE analysis as per Feb <br /> 29, 1996 EHD letter. New comment <br /> letter started for all Ultramar sites. <br /> 06/19/96 M. Infurna 215 0.7 MTBE comment finished. <br /> 06/19/96 M. Infurna 212 0.3 Hal Hansen calls for appointment to <br /> sample wells for 6/21. OK'd by MI. <br /> Discuss MTBE letter and advise <br /> sampling start with this event. <br /> Total Hours 18.9 <br />