My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 6:02:35 PM
Creation date
3/10/2020 4:13:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Beacon Station No.12 474 7/25/2002 <br /> Stockton California Additional Deleniation Work Plan <br /> ~ Task 5 Submit the groundwater samples, under chain of custody documentation to a <br /> certified laboratory to be analyzed for TPHg, BTEX, and the fuel oxygenates <br /> methanol, ethanol, tertiary butanol, MTBE, DIPE, ETBE, TAME, and the lead <br /> scavengers 1,2-DCA, and EDB. <br /> Task 6 Prepare and submit a report detailing field methods, results and conclusions of <br /> this investigation and if appropriate a revised PAR/CAP. <br /> Interim Soil Remediation Scope <br /> i <br /> Task 1 Design and submit permits for installation of an interim soil vapor extraction <br /> system (SVES). These permits include an authority to construct (ATC) from <br /> the San Joaquin Valley Air Pollution Control District, and building and <br /> electrical permits from the City of Stockton and utility companies. <br /> Task 2 Install subsurface PVC piping from selected vapor extraction wells to a <br /> remediation compound location. During installation of the VES piping <br /> additional piping for air sparging or groundwater extraction should be installed <br /> to minimize the cost of upgrading the final treatment system. <br /> Task 3 Install remediation equipment in the compound for extracting and abating <br /> hydrocarbons from the subsurface. As "indicated in the previously submitted <br /> CAP, soil vapor extraction has been shown effective in removing hydrocarbons <br /> from the subsurface at this site. <br /> Task 4 Prepare a report documenting installation of the interim SVES and results of <br /> the startup. <br />�I <br /> C:\Projects\1474\13\1474-13.wp.doc <br /> 1474-13.wp 4 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.