My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005392
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
ARCHIVED REPORTS_XR0005392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 6:31:16 AM
Creation date
3/10/2020 4:35:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005392
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beacon Station No.474 August 2, 1996 <br /> Stockton,California Assessment Report <br /> Drilling, Soil Sampling, and Groundwater Sampling <br /> Between May 8 and May 10, 1996, a Horizon geologist observed the drilling of soil borings <br /> B-1 through B-4, MW-4, and MW-5. The location of the borings and wells were selected to <br /> attempt to delineate gasoline hydrocarbons in the soil and groundwater beneath the site and <br /> in the area adjacent to the site as proposed by AMV in the work plan. The borings were <br /> drilled and sampled using a truck-mounted a CME-75 drill rig equipped with 8-inch <br /> diameter hollow-stem augers. Drilling was performed by Mitchell Drilling Environmental <br /> Corporation of Rancho Cordova, California. Borings B-1, B-3, and B-4 were advanced to a <br /> depth of approximately 461/2 feet bgs and boring B-2 was advanced to a depth of <br /> approximately 751/2 feet bgs. Borings MW-4 and MW-5 were advanced to depths of <br /> approximately 86 feet to 86%2 feet bgs. The approximate Iocation of the borings are shown <br /> on Figure 2 and identified as B-1 through B-4, MW-4, and MW-5. Groundwater was <br /> initially encountered in the borings at depths of approximately 80 feet bgs and rapidly rose <br /> to a depth of approximately 71 feet to 72 feet bgs. During drilling, soil samples were <br /> collected from the borings at 5-foot intervals from the ground surface to the total depth of <br /> the borings. Soil samples and cuttings were evaluated for the presence of petroleum <br /> hydrocarbon vapors with an organic vapor meter (OVM). Evidence of petroleum <br /> hydrocarbons are noted during drilling and are included in the soil boring logs. The soil <br /> boring logs containing soil descriptions are included in Appendix C. Upon completion of <br /> drilling, a 2-inch ID groundwater monitoring well was constructed in borings MW-4 and <br /> MW-5. Borings B-1 through B-4 were backfilled to grade using a "6-sack" neat cement <br /> slurry. <br /> Sediments encountered during drilling consisted primarily of clayey silt and silty sand from <br /> approximately surface grade to .the. total .depth..of. the .borings. The sediments from the <br /> borings were classified using the Unified Soil Classification System (USCS). A copy of the <br /> USCS is shown on the Boring Log Symbol Key in Appendix C. <br /> 3 <br /> 1474.11-RPT HORIZON ENVIRONMENTAL.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.