My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005417
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
3500 - Local Oversight Program
>
PR0545495
>
ARCHIVED REPORTS_XR0005417
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 8:02:56 AM
Creation date
3/10/2020 4:45:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005417
RECORD_ID
PR0545495
PE
3528
FACILITY_ID
FA0006423
FACILITY_NAME
STOCKTON MOBIL 2
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beacon Station No.474 December 23, 1997 <br /> Stocic "tional sub e Invegigation Report <br /> above grade with a concrete apron. The construction details are shown on the corresponding <br /> boring logs in Appendix D. <br /> ' Groundwater 't 1 Development andSampling <br /> On September 30 and October 1, 1997, Horizon personnel conducted well development, <br /> ' purging and sampling of groundwater monitoring wells MW-6 through MW-9. Depth to <br /> groundwater levels were taken before and after purging and sampling, and were recorded on <br /> ' Monitoring Well Data Sheets (Appendix E) and summarized in Table 2. Groundwater <br /> samples were contained in chilled storage for transport to the laboratory for the requested <br /> ' analyses. <br /> Wellhead lev ti ry nd .113-ray-n r F i cti n <br /> On November 6, 1997, Horizon personnel extended the existing well elevation survey to the <br /> ' new monitoring wells (Appendix F). The calculated wellhead elevations are included with <br /> the well numbers on Table 2, along with the groundwater data collected from the wells <br /> during the sampling event. The overall groundwater flow direction was estimated to be <br /> ' towards the south/southwest for the October 1, 1997 data collected only from wells MW-6 <br /> through MW-9 (Figure 3).: <br /> 1 <br /> LABORATORY METHODS AND RESULTS <br /> ' S_oj1 Samplea <br /> Soil samples collected from borings MW-6 through MW-9, B-5, and B-6 were submitted <br />' under chain-of-custody (COC) to Kiff Analytical (Kiff), a State-certified laboratory in <br /> Davis, California (Certificate No. 2236). Selected soil samples were analyzed for: total <br /> Petr_o.le.um hydrocarbons as gasoline-(TPHg), the gasoline constituents benzene, toluene; -- <br /> ethylbenzene, and xylenes (BTEX), and MTBE by modified Environmental Protection <br />' Agency (EPA) Methods 801518020. In addition, the soil samples with the highest OVM <br /> reading from each boring were analyzed for the oxygenated fuel additive compounds <br /> 1 1474-12.rpt 6 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.