Laserfiche WebLink
a er <br /> page 4 <br /> TASK 7 - LABORATORY ANALYSIS <br /> and groundwater samples from the monitor well will be <br /> Soil and groundwater samples will bt%ent to a state-certified hazardous matertestinge laboratory. <br /> All soil samples selected <br /> modified A rrIethad 8015 and BTF�by EPA Meth <br /> od 8020" <br /> analyzed for TPH-g Y <br /> TASK 8 - ANALYZE DATA the vertical and lateral extent of <br /> undwater contamination will be evaluated. <br /> After the soil and groundwater laboratory data is available, ►f n�essary• <br /> subsurface soil contamination and lateral ex.ent of gro <br /> Based on this data,a remediation work plan can be developed, <br /> TASK 9 - PREPARE REPORT <br /> a summary report <br /> Following completion of thefield <br /> dand receipt <br /> of analytical <br /> and outlining the findings and conclusions <br /> documenting the field work,presenting <br /> will be submitted to the appropriate agencies- <br /> ESTIMATED SCIIIEDULE <br /> Da s After Re tato Approval <br /> Task <br /> approval for work plan and safety plan 10 <br /> 1-Obtain app <br /> 15 <br /> 2-Drill Soil Boring <br /> 3-Instal!and Develop Monitor Wel! 18 <br /> Sampling 22 <br /> 4-Groundwater Purging and Sam P <br /> 28 <br /> 5-Survey wells <br /> 35 <br /> 6- Perform Pump Test 28 <br /> 7-Laboratory analyses <br /> 35 <br /> 8-Analyze data <br /> 38 <br /> 9-propare report <br /> 4165 Rialto Court, pittsburg, CA" 94565r8116 <br /> porker Environmental Services, P 439.2566 <br /> phone {415} 433-1024 Fax (415) <br />