Laserfiche WebLink
i <br /> Page 5 <br /> Please call us at(415)439.1024 if you have any questions or comments. <br /> Sincerely, �0�SED G4.0 <br /> Parker Environmental Services ���`res JRc0 c <br /> �� es n <br /> r <br /> .4815 � <br /> James D.Parker <br /> ?'1Mqes1A.Jacobs, G. <br /> 5 tip <br /> President Principal Geologist OF GAIAFoe <br /> t� <br /> JAJ/sd <br /> cc: Ms.Eleanor Ratliff,REELS, San Joaquin County,Public Health Services, Environmental <br /> Environmental Health Division <br /> Central Valley Regional Water Quality Control Board <br /> FIGURES: <br /> 1. Site Plan Map with Location of Proposed Soil Boring and Proposed Monitor Well <br /> 2. Generalized Well Construction Details <br /> ATTACHMENTS: <br /> 1. The Parker standard operating procedures for drilling soil borings and obtaining soil samples. <br /> 2_ The Parker standard operating procedures for collecting organic vapor data. <br /> 3. The Parker standard operating procedures for well installation and development. <br /> 4..The Parker standard operating procedures for groundwater purging and sampling. <br /> 5. Site safety plan. <br /> Parker Environmental Services, 4185 Rialto Court, Pittsburg, CA 94565-6116 <br /> Phone (415) 439-1024 Fox (415) 439-2566 <br />