My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 8:23:22 AM
Creation date
3/11/2020 8:21:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Bay MUD - 6 - 10 March 1995 <br /> Memo #2 - <br /> TEM FRAME <br /> A. The "life-span" of the enzymes upon injection is two weeks. <br /> B. The duration of the remediation will be approximately two to four weeks, including <br /> obihtion:'and demobilization time. <br /> Wall active remediation(ezrncctwn/mrxiig mvyecdwO occur fir only two weeks? <br /> WM the enzymes be added at the begirnmg of the".two weeks, then chruhted usog <br /> eh(�u�cdon/rWh jectian or will the enzymes be added periodicaUy dumCho t the two-week <br /> �a:� <br /> Is two weels long enough to erm a dispersd of the fi#ected m"rid dnoaghout the <br /> cor>hcnr bKod area? <br /> C. During start-up, 650 gallons of ground water will be extracted and collected in a mixing tank. <br /> D. This volume will be maintained in order to provide sufficient retention time for the enzyme <br /> mixture to adequately degrade petroleum hydrocarbons. <br /> E. The actual rate of extraction and volume removed will be monitored and adjusted to ensure <br /> sufficient capture zone. <br /> - Hvw wall the monihN rg and adjustment be conducted? <br /> - Wi?l ekwa dons and depdt to water meamm,, era's be collected from wW of the other wells <br /> to provide v:firsr` on the gradient and movement of the h ected materid? <br /> F. The system will be operated 12 hours/day and will operate at night. <br /> Why wiU die system operte only 12 hotax/day? <br />
The URL can be used to link to this page
Your browser does not support the video tag.