My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 7:38:45 AM
Creation date
3/11/2020 8:24:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
liners. One of the middle brass liners will be immediately capped with Teflon covers <br /> and plastic end caps for submittal to the District laboratory. 'A headspace analysis <br /> will be performed on one of the other brass retainers and readings will be recorded. <br /> Visual and physical descriptions of the remaining soil in the liners will be used to <br /> identify soil types and geologic units. The Unified Soil Classification System (USCS) <br /> will be used to classify soil type. Geologic data will be recorded on boring logs. <br /> Soil samples will be collected to total depth. Only vadose zone samples will be <br /> submitted for chemical analysis. <br /> The soil samples will be submitted to the District laboratory and analyzed for <br /> TPH-g by EPA Method 8015-Modified/EPA Method 5030 and BTEX by EPA <br /> Method 8020. Ten percent of the soil samples will be analyzed for total lead by EPA j <br /> Method 6010 or 7000 series (Inductively Coupled-Argon Plasma/Atomic Absorption <br /> [ICAP/AA] methods). Holding times for these soil analyses is 14 days for TPH-g <br /> and BTEX, and 28 days for total lead. The analytical methods and other analytical <br /> requirements are specified in Appendix C. The samples will be numbered and <br /> packaged as specified below. <br /> Sample Numbering and Packaging <br /> ' Each sample will be given a sample number so that the analytical data may be <br /> readily associated with the correct sampling location. The sample number will <br /> designate the sampling location, matrix, and date through the use of a three part j <br /> number. The following is an example sample number. MW-8/S/893. In this <br /> r example, the.first part of the number designates that the sample location is MW-8. <br /> L The second part of the number indicates that the matrix is Soil. The third part of the <br /> number indicates that the sample was collected in August 1993. <br /> A sample label will be affixed to each sample upon collection. The sample <br /> labels will include the following information: <br /> • Sample number <br /> • Sample collection date/time <br /> • Sampler name and signature <br /> 93R22 East Bay Municipal Utility District <br /> 40429200.wp 11 Work Plan-Stockton Service Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.