My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 7:38:45 AM
Creation date
3/11/2020 8:24:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3A. Using a clear bailer, a volume of groundwater will be pulled from the well and <br /> checked for petroleum hydrocarbons with a PID or FID, then visually observed for <br /> sheen. Prior to sampling, the wells will be measured for free product, measured for <br /> water levels, and purged. <br /> Quality Control Samples <br /> Quality Control samples will be collected to provide a check on the sampling, <br /> { analysis, and shipping procedures. One split sample will be collected for every ten <br /> L samples collected and analyzed by an outside laboratory to provide a check on the <br /> analytical procedures. Because of the volatility of the analytes, the samples will not <br /> actually be split, but duplicated instead. The split samples will be submitted for the <br /> same suite of analyses as the other samples to a State certified laboratory <br /> subcontracted by the District. One duplicate groundwater sample will be collected <br /> from one of the monitoring wells during the initial sampling of the new wells and <br /> ,. g g P <br /> during each quarterly monitoring event. These quality control samples will be <br /> collected and handled in the same manner as the other samples. The duplicate <br /> samples will be submitted for the same analyses as the other samples. One laboratory <br /> prepared trip blank, consisting of three.40 ml vials, will be shipped with the collected <br /> samples to provide a check on the shipping procedures. The trip blank will be <br /> "J submitted to the District laboratory for BTEX analyses. <br /> D. Quarterly.Monitoring <br /> Quarterly monitoring will be conducted at the site to determine the seasonal <br /> effect on the groundwater and to track any movement of the contaminant plume. <br /> �..; BVWST will collect groundwater samples from each of the existing and new wells on <br /> a quarterly basis, beginning with the third quarter of 1993 (Weston has performed <br /> Lquarterly monitoring for the first two quarters of 1993). The samples will be <br /> collected as described for the groundwater monitoring in Section 4B. Samples will be <br /> numbered and packaged as specified in Section 3A: <br /> E. Tidal Monitoring <br /> Because of the proximity to the Stockton Deep Water Channel, the groundwater <br /> at the site may be influenced by the tides. The tidal influence will be observed by <br /> Lmeasuring the water level in .the Stockton Deep Water Channel during each <br /> groundwater sampling event. BVWST will use an electronic oil/water interface probe <br /> 93R22 East Bay Municipal Utility District . <br /> 40429200.wp 19 Work Plan-Stockton Service Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.