Laserfiche WebLink
to measure the elevation.of the water in.the Stockton Deep Water Channel. <br /> Measurements will be taken from the same location immediately before and after the <br /> water levels in the groundwater monitoring wells are taken.- The average of these two <br /> readings will be reported. The elevation of the measuring point will be surveyed by <br /> the licensed surveyor and related to msl. <br /> F. Management of Investigation-Derived Waste <br /> LThe well development and purge water will be containerized in DOT-approved <br /> 17E/H 55 gallon drums. Handling, sampling, and disposal of IDW generated during <br /> groundwater sampling events has been discussed in Section 3B. <br /> j 5.0 SITE SAFETY PLAN <br /> i.. <br /> The following site specific safety plan has been prepared in accordance with the <br /> Occupational Safety and Health Act (OSHA) Section 1910.120 for BVWST's planned <br /> supplemental assessment and quarterly monitoring activities. This plan will be <br /> adhered to by BVWST and its subcontractors. <br /> i <br /> C <br /> E <br /> 93822 East Bay Municipal Utility District <br /> 40429200.wp 20 Work Plan-Stockton Service Center <br />