Laserfiche WebLink
l <br /> r� <br /> ....Water <br /> Analytical ; <br /> Parameter Concentration Concentration <br /> Location Location <br /> t�gn) <br /> Benzene ND --- 1,700 MW-1 <br /> Toluene 37 MW-4 11 MW4 <br /> L Ethylbenzene 2.4 B-2 30 MW-1 <br /> Xylenes 3.5 MW-4 610 MW-1 <br /> f TPH-g 39 13-1 5,000 MW-1 <br /> r III. SCOPE OF WORK <br /> LB. Planned Site Activities and Dates. B&V Waste Science and Technology Corp: (BVWST) will perform a field investigation to further assess the <br /> groundwater and soils at the site. <br /> • Collect a maximum of eight HydroPunch II® samples from onsite <br /> J locations. <br /> L • Install a maximum of two monitoring wells using a truck-mounted hollow stem auger drilling rig. <br /> L • During the drilling of the monitoring well borings, collect soil <br /> samples at 5-foot intervals. Submit the samples to the District <br /> Claboratory for chemical analysis. <br /> L • Collect a composite soil sample and submit to the District laboratory for waste profile characterization analyses. <br /> ,■ . • Collect a groundwater sample and submit to the District laboratory <br /> for waste profile characterization analyses. <br /> L <br /> 93822 East Bay Municipal Utility District <br /> 40429200.wp 22 Work Plan-Stockton Service Center <br />