Laserfiche WebLink
L <br /> • Dispose of sampling and other investigation-derived wastes after <br /> i <br /> receipt of waste characterization.results. <br /> • Develop the new groundwater monitoring wells. Collect <br /> groundwater samples from the new and four of the existing <br /> groundwater monitoring wells (MW-1, MW-2, MW-4, and MW-7). <br /> L Submit the samples to the District laboratory for chemical analysis. <br /> P rY Y <br /> �; • Perform quarterly monitoring: collect groundwater samples from <br /> the new wells and MW-1, MW-2, NIW-4, and MW-7 on a <br /> quarterly basis for chemical analysis by the District laboratory. <br /> Field work is scheduled to begin the week of July 26, 1993. Quarterly <br /> monitoring will be conducted through the fourth quarter of 1995. <br /> L.� B. Number of People on Site. <br /> Two BVWST personnel: one geologist and one Site Safety Coordinator <br /> (SSC). <br /> Drilling Crew: One driller and one helper. <br /> ` Two field personnel for quarterly monitoring: one BVWST SSC and one <br /> field technician supplied by the subcontracted analytical laboratory. <br /> C. Number of Days to Complete Work. <br /> Estimate three days for initial field work. Estimate one day each quarter <br /> for quarterly monitoring. <br /> 93822 East Bay Municipal Utility District: <br /> 40429200.wp 23 Work Plan-Stockton Service Center <br /> I ' <br />