My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 7:38:45 AM
Creation date
3/11/2020 8:24:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> • Dispose of sampling and other investigation-derived wastes after <br /> i <br /> receipt of waste characterization.results. <br /> • Develop the new groundwater monitoring wells. Collect <br /> groundwater samples from the new and four of the existing <br /> groundwater monitoring wells (MW-1, MW-2, MW-4, and MW-7). <br /> L Submit the samples to the District laboratory for chemical analysis. <br /> P rY Y <br /> �; • Perform quarterly monitoring: collect groundwater samples from <br /> the new wells and MW-1, MW-2, NIW-4, and MW-7 on a <br /> quarterly basis for chemical analysis by the District laboratory. <br /> Field work is scheduled to begin the week of July 26, 1993. Quarterly <br /> monitoring will be conducted through the fourth quarter of 1995. <br /> L.� B. Number of People on Site. <br /> Two BVWST personnel: one geologist and one Site Safety Coordinator <br /> (SSC). <br /> Drilling Crew: One driller and one helper. <br /> ` Two field personnel for quarterly monitoring: one BVWST SSC and one <br /> field technician supplied by the subcontracted analytical laboratory. <br /> C. Number of Days to Complete Work. <br /> Estimate three days for initial field work. Estimate one day each quarter <br /> for quarterly monitoring. <br /> 93822 East Bay Municipal Utility District: <br /> 40429200.wp 23 Work Plan-Stockton Service Center <br /> I ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.