My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 3:12:05 AM
Creation date
3/11/2020 11:00:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ECOR <br /> Ms. Margaret Lagorio <br /> 76 Station No. 5886 <br /> February 21,2008 <br /> Page 2 ., <br /> As shown on the attached map from SECOR's Quarterly Remedial Performance Summary <br /> — First Quarter 2004, dated April 30, 2004, a tank pit well is located near MW-3, and it <br /> i' appears that TRC field personnel monitored and sampled this tank pit well instead of well <br /> MW-3. SECOR has requested that TRC sample MW-3 instead of the tank pit well, that <br /> they include the tank pit well on their site plan to avoid confusion of these two wells in the <br /> future, and that their tables be revised to indicate the well monitored and sampled. <br /> SECOR has also requested that TRC return to the site during the first quarter 2008 to <br /> sample MW-3, because during telephone communication on February 20, 2008, SECOR <br /> confirmed that TRC had again 'sampled the tank pit well instead of MW-3 during the first <br /> quarter 2008 sampling event. <br /> Ifou have any y questions or comments regarding this letter, please do not hesitate to f <br /> contact Lee Ignatowicz at (916) 861-0400 x 265 or at direct line 916 — 384 - 0795. ' <br /> Sincerely, <br /> SECOR International Incorporated <br /> i <br /> Lee Ignatowicz <br /> Associate Geologist <br /> Diane Barclay, P.G.. <br /> Senior Geologist <br /> I <br /> i <br /> Attachment: Site Plan from SECOR's Quarterly Remedial Performance Summary—First <br /> Quarter 2004, dated April 30, 2004. <br /> cc: Mr. Eric Hetrick, ConocoPhillips <br /> Mr. James Barton, RWQCB — Central Valley Region <br /> Mr. Darrell Eppler, 2701 West March Lane, Stockton, CA 95219 <br /> 5886-well MW-3.doc SECOR International Inc. <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.