My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012447
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 12:04:33 AM
Creation date
3/11/2020 11:48:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012447
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI 205511 11S R22 Tosco Famfily 5$86,Stockton,Caldorma _ October 29,2002. <br /> • September 1996 ; UnocaI drilled four additional soil bormgs, and constructed groundwater <br /> monitoring wells in three of these borings (Delta, December 5, 1996) <br /> • March 1997 - Tosco submitted a Work Plan for Supplemental Environmental Investigation <br /> (ERI, March 28, 1997) to the County <br /> • April 1997 - Tosco submitted an Addendum to Work Plan (ERI, April 3, 1997) to the County <br /> • April 1997 - Tosco performed a soil and groundwater investigation at the site The <br /> investigation included hand-auguring three soil borings adjacent to catch basins, drilling four <br /> soil borings, and constructing dual-completion groundwater monitoring wells (MW4SID <br /> through MW7S/D) at discrete depths in the borings (ERI, June 3, 1997) <br /> • July 1997 - Tosco submitted a Work Plan for Supplemental Environmental Investigation <br /> (ERI, July 14, 1997) to the County <br /> • August 1997 - Tosco submitted the Addendum to Work Plan (ERI, August 8, 1997) to the <br /> County <br /> • JuIy 1997 through December 1998 - Tosco performed an underground utility search <br /> (ERI, October 6, 1997) (Plate 2), continued to perform quarterly groundwater monitoring and <br /> sampling, obtained access agreements to drill soil borings at select properties located south and <br /> southwest of the site, and requested that Sequoia Analytical Laboratories (Sequoia) review <br /> chromatograms of groundwater samples collected during the September 1995 Geoprobe® <br /> investigation (Delta, February 6, 1996) and provide an estimate of methyl tertiary butyl ether <br /> (MTBE) concentrations in groundwater (ERI, March 2, 1999) <br /> • February 1999 - Tosco advanced three off-site cone penetrometers (CPTI through CPT3) and <br /> drilled three off-site soil borings (B$ through 1310) (ERI, March 2, 1999) <br /> • April 1999 - Tosco installed nine off-site groundwater monitoring wells, consisting of three <br /> nested wells (shallow, intermediate, and deep) at each of three well locations <br /> (ERI, June 9, 1999) <br /> • April 1999 - Tosco submitted the Work Plan for Supplemental Evaluation <br /> (ERI, April 16, 1999) to the County <br /> • May 1999 - ERI submitted the report entitled Air Sparge/Soil Vapor(AS/SVE) Extraction <br /> Test, dated October 18, 1999, presenting the data collected during ERI's May 1999, ASISVE <br /> feasibility test <br /> • December 28, 1999 - ERI submitted the report entitled Corrective Action Plan (CAP) Tosco <br /> received a letter from the County dated February 22, 2000, approving the remediation <br /> recommendations provided in ERI's December 28, 1999 CAP as an interim remedial (IR) <br /> action <br /> • 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.