Laserfiche WebLink
ERI 205513 OSR22 Tosco Faczluy 5886 Stockton Calxforma October 29,2002 <br /> • • During second quarter 2000, ERI installed one UST cavity well in general accordance with the <br /> CAP (ERI, December 28, 1999) and Tosco initiated periodic purging of groundwater from the <br /> UST cavity well and from groundwater monitoring well MW3 Groundwater purging was <br /> temporarily discontinued during third quarter 2000 pending clarification from the County <br /> regarding water sampling and data collection requirements Purging was resumed during <br /> January 2001, and continued through January 2002, when it was terminated following <br /> installation and operation of the microsparge remediation system Approximately 285,000 <br /> gallons of groundwater were purged from the UST cavity well and well MW3 and transported <br /> to the Tosco refinery for recycling during interim groundwater remediation efforts <br /> • During June 2001, Tracer Research Corporation (TRC)performed an enhanced leak detection <br /> test on underground storage systems to evaluate the system integrity According to Tosco, the <br /> results of the enhanced detection test indicated that the underground storage systems are <br /> functioning within acceptable parameters <br /> During third quarter 2001, ERI submitted a CAP, dated September 25, 2001 The CAP <br /> included recommendations to install a microsparge system to remediate MTBE impacted <br /> groundwater beneath the site <br /> During first quarter 2002, the microsparge remediation system was completed and ERI <br /> performed system startup and initiated monthly operation and mamtenance (O&M) of the <br /> system <br /> iCurrently, there are ten on-site AS wells (AS I. through AS5, AS7, ASS, and AS 10, and nested wells <br /> AS6S/D and AS9S/D), three on-site, single-casing groundwater monitoring wells (MW 1 through <br /> MW3), four on-site, dual-casing groundwater monitoring wells (MW4S/D through MW7S/D), one <br /> on-site UST cavity well, and nine off-site groundwater monitoring wells (MW8S/l/D through <br /> MW IOS/IID) consisting of three wells at each nested well location as shown on Plate 2 and the On-Site <br /> Well Locations (Plate 3) <br /> Based upon data collected during ongoing quarterly groundwater monitoring and sampling, dissolved <br /> hydrocarbons are effectively delineated both laterally and vertically in the vicinity of the site <br /> However, dissolved hydrocarbons continue to be detected in groundwater samples collected from <br /> on-site wells and are concentrated in the vicinity and downgradlent of the UST cavity <br /> THIRD QUARTER ACTIVITIES <br /> Based upon previous work completed at the site, and in accordance with the correspondence and <br /> request from the County, the following tasks were performed during the third quarter 2002 <br /> • ERI performed monthly remediation system O&M and collected monthly groundwater samples <br /> from wells MW 1 through MW3 <br /> . 3 <br />