My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2900 - Site Mitigation Program
>
PR0505510
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 2:18:03 PM
Creation date
3/11/2020 1:13:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0505510
PE
2950
FACILITY_ID
FA0006825
FACILITY_NAME
SHELL GAS & SERVICE STATION
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416004
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Introduction <br /> IT Corporation was retained by BP Oil to perform a preconstruction site assessment and <br /> provide environmental assistance to UST replacement and associated construction activities at <br /> BP Oil Station 11190, located at 1206 March Lane in Stockton, Califomia. This work <br /> consists of the following tasks: <br /> • Examining San Joaquin County Health Department UST records regarding the <br /> site (completed) <br /> + • Preparing a Soil Contamination Work Plan (completed) <br /> • Field Investigation (completed) <br /> • Preparing a Preliminary Investigation and Evaluation Report and Soil <br /> Remediation Proposal (completed) <br /> • Providing environmental sampling during UST replacement and other <br /> construction activities (to occur) <br /> • Coordinate soil disposal (to occur) " <br /> • Preparing a UST Closure Report (to occur). <br /> During recent discussions with San Joaquin County Public Health Services Environmental <br /> Health Division personnel, it was determined that the pre-construction site assessment <br /> requested by BP Oil was to be permitted by San Joaquin County as an Environmental <br /> �- Assessment and was to be performed as outlined in Figure A-1 of Appendix A of the "Tri- <br /> Regional Board Staff Recommendations for Preliminary Evaluation and Investigation of <br /> Underground Storage Sites (January 1991)" (Appendix A). The documents listed as tasks <br /> (above) are designed along those guidelines. <br /> 2.0 Site Background <br /> 2.1 Location <br /> The site is located at 1206 March Lane in Stockton, California, at the southwest comer of <br /> March and West Lanes (Figure 1). The site is surrounded on all sides by public roadway and <br /> lies in a commercially-zoned area consisting of single-story buildings and fields. The nearest <br /> MA/8-12-91/ENG/9284MER 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.